系统技术·发现阻力·需要优先核实

DK系统技术批量证据呈现集中问题信号

在系统技术域识别 4 个独立问题证据单元,覆盖 10 条原始记录,来自 3 个独立发布机构、3 个地区;最大证据组来自 OpenAlex,覆盖 7 条原始记录;找到 1 个可直接比较的反证或进展,覆盖 32 条原始记录。

为什么重要

  • 如果该信号持续,可能影响系统技术相关项目的转化速度、成本或可靠性。

还缺什么

  • 同口径项目分母与时间序列
  • 项目级状态、发生时间和最终结果
  • 来自业主或监管方的独立验证

替代解释

  • 材料增长可能来自披露频率变化,而不是问题真实恶化。
  • 同一事件可能被不同来源重复报道,需要核对项目与事件身份。

审计信息

  • 本页只使用欧洲和中国范围内的证据。
  • 本轮输入 1227 条材料
  • 问题卡生成于 2026/11/4 07:14:01
  • 内部排查优先级为 76 分;它不代表发生概率或严重程度。

问题依据 · 4

E1·European Commission Directorate-General for Energy·采集/快照 2026/8/26

European grid capacity, connection queues and anticipatory investment

The EU has one of the most extensive and resilient electricity networks in the world, spanning over 11 million kilometres across its internal market, ensuring that high-quality electricity is delivered to its consumers every day. At the same time, Europe’s power networks are confronted with new and significant challenges such as insufficient grid capacity to meet growing connection requests both on the demand and supply side, delays in project implementation and security threats. European Grids Package The Commission presented the European Grids Package (COM/2025/1005) on 10 December 2025, following the EU Action Plan for Grids adopted in November 2023. It consists of a proposal to revise the TEN-E Regulation and a proposal to accelerate permit granting procedures by amending the Renewable Energy Directive, the Electricity Market Design and the Gas Directive. The process leading to the final package included a call for evidence and an open public consultation between 13 May and 5 August 2025. ©AdobeStock/PictRider Together, the proposals aim to address the key challenges for cross-border energy infrastructure in the EU, focusing on * better coordination at EU level to map and plan the required grids infrastructure * more effective tools for cost-sharing, ensuring projects are funded in a fairer and more equitable way * speeding up and streamlining permitting processes for grids, renewables, storage and recharging stations projects, while ensuring public acceptance and benefit-sharing * making existing infrastructure more efficient, reinforced by new technology, flexibility, and storage capacity * enhancing the resilience and security of our cross-border energy infrastructure The package also includes 2 guidance documents on efficient and timely grid connections and the design of 2-way contracts for difference. Grid connections The increase in demand and deployment of clean energy sources puts strong pressure on network needs. This is evidenced by grid connection queues being present in at least 16 EU countries as of mid-2026, with data pointing to some 120 GW of mature renewable projects including 1.5 million household installations at risk of not getting timely grid access by 2030 ( EMBER, 2026 ). There are multiple root causes leading to emergence of grid connection queues, which are linked to inadequate planning and delays in network development, lack of transparency on available capacity and locational incentives for users, and grid connection procedures not accounting for maturity of the projects requesting the connection. The Guidance on efficient and timely grid connections (C/2025/8473) which provides recommendations and shares good practices that EU countries and national regulatory authorities can apply to address these challenges immediately and make the most efficient use of existing grids. These include applying the ‘first-ready first-served’ principle, transparent maturity criteria for all connection requests, establishing clear project-development milestones with associated penalties for non-compliance, and conducting regular monitoring and cleaning of the connection queues. To support the implementation of the Guidance, the Commission, in cooperation with ACER, ENTSO-E, DSO Entity and involving regulatory authorities, EU countries and other stakeholders, is organising a series of targeted stakeholder workshops covering anticipatory investments, flexible connection agreements and grid connections. The first workshop took place on 15 April 2026 to explore the implementation of flexible connection agreements (FCA) and hybrid energy systems as tools to address grid congestion and accelerate renewable energy integration. The workshop summary and presentations are available online. The Commission proposal to future-proof electricity bills in the EU (COM/2026/600) of July 2026 further clarified the application of grid connection measures in case of network congestion by regulatory authorities. 2-way contracts for difference The Guidance on the design of 2-way contracts for difference (C/2025/8479) which provides guidance to EU countries on how to design 2 way-contracts for difference between a power-generating installation operator and a counterpart, usually a public entity, in a way that supports efficient investments, in light of the existing regulatory framework. It also gives examples of how the design criteria for 2 way-contracts for difference, set out in the Electricity Regulation (EU/2019/943) and Renewable Energy Directive (EU/2023/2413), can be met. Energy Highways The Energy Highways initiative, set out as part of the European Grids package, will address 8 key bottlenecks across Europe which represent the most urgent energy infrastructure needs. By supporting the concrete implementation of projects on the ground, it will enhance overall security of supply, help integrate more renewables into the system and reduce reliance on fossil fuels, thus decreasing energy prices. The Commission will fast-track the Energy Highways with targeted support for the EU countries concerned and the project promoters involved, including leveraging financing and measures to further streamline and accelerate permit-granting processes to help bring the projects to a successful conclusion. The 8 Energy Highways are: * Iberian Peninsula: Electricity interconnections across the Pyreneans to better integrate the Iberian Peninsula (Pyrenean crossing 1 and Pyrenean crossing 2). * Great Sea Interconnector: Ending electricity isolation by connecting electricity between Cyprus and continental Europe. * Harmony Link: Strengthening electricity interconnection of the Baltic States, boosting energy security and energy independence from Russia. * TransBalkan Pipeline: reverse gas flow to increase the resilience of energy supplies in the Balkan region and eastern neighbourhood. * Bornholm Energy Island: Transforming the Baltic Sea into an offshore interconnector hub. * South-East Europe: Improve price stability and energy security in southeastern Europe, including through storage. * SouthH2 Corridor: The South hydrogen corridor involving Tunisia, Italy, Austria and Germany. * Southwest hydrogen corridor: from Portugal to Germany A European Grid Action Plan As part of the European Green Deal, the Commission published a Grid Action Plan (COM/2023/757) in November 2023. It highlighted that electricity consumption in the EU is expected to increase by around 60% by 2030. Our networks therefore have to become more digitalised, decentralised and flexible. With 40% of our distribution grids being over 40 years old, and cross-border transmission capacity due to double by 2030, €584 billion in investments are necessary. The Action Plan identifies concrete and tailor-made actions to help unlock the investment required to get European electricity grids up to speed. It focuses on implementation and swift delivery, so that the actions can make a difference in time to contribute to our 2030 objectives. The Action Plan identifies 7 areas of concrete and tailor-made actions to help unlock the investment required to get European electricity grids up to speed. It focuses on implementation and swift delivery, so that the actions can make a difference in time to contribute to our 2030 objectives. * accelerating the implementation of Projects of Common Interest and developing new projects * improving long-term grid planning for a higher share of renewables and increased electrification * introducing regulatory incentives for forward-looking grid build-out * incentivising a better usage of the grids * improving access to finance * accelerating deployment through faster permitting and public engagement * strengthening grid supply chains * In October 2025, the Commission published a study on network development planning, tariff structures and connection requests for electricity distribution grids that explores best practices and provides key recommendations. Anticipatory investments On 2 June 2025, the Commission presented a Guidance document on anticipatory investments for developing forward-looking electricity networks, replying to actions in both the Grid Action Plan and the Action Plan for Affordable Energy. The document addresses EU countries, national regulatory authorities and transmission and distribution system operators. It offers concrete recommendations on network planning, regulatory scrutiny and costs and incentives to help them create the right conditions so that grid investments reflect future needs, while also ensuring affordability for consumers and the competitiveness of industry. The Commission and ACER organised a stakeholder workshop on 11 March 2026 to advance the implementation of the Guidance. The discussion focused on how to mitigate risks related to anticipatory investments through robust network planning and early stakeholder involvement. See more details in the workshop summary and main conclusions. Related links Press material * 26 January 2026 Energy Highways: Germany and Denmark agree on joint development of the Bornholm Energy Island offshore wind project * 10 December 2025 Commission proposes upgrade of the EU's energy infrastructure to lower bills and boost independence, Questions and answers, Factsheet * 2 June 2025 EU guidance on ensuring electricity grids are fit for the future * 13 May 2025 Commission collects views in preparation of the European Grids Package * 28 November 2023 Commission sets out actions to accelerate the roll-out of electricity grids * Public inclusion toolbox for renewable energy * Study: Study on network development planning, tariff structures and connection requests for electricity distribution grids (October 2025) * Guidance document on anticipatory investments for developing forward-looking electricity networks (C/2025/3291) * EU Action Plan for Grids (COM/2023/757) * Affordable Energy Action Plan (COM/2025/79) * Clean Industrial Deal * Competitiveness Compass for the EU

non-compliance原始依据
E1·China Southern Power Grid Supply Chain Platform·来源发布 2026/9/4

深圳电网智慧能源技术有限公司2026年构网型电化学储能系统技术改造项目(储能系统仿真测试、调试及搬迁配套服务,并网性能试验及人工短路试验,安全评价)专项服务公开招标中标公示

深圳电网智慧能源技术有限公司2026年构网型电化学储能系统技术改造项目(储能系统仿真测试、调试及搬迁配套服务,并网性能试验及人工短路试验,安全评价)专项服务公开招标中标候选人公示(招标编号:CG0900022002369186) 公示开始时间:2026-09-04 公示结束时间:2026-09-07 深圳电网智慧能源技术有限公司2026年构网型电化学储能系统技术改造项目(储能系统仿真测试、调试及搬迁配套服务,并网性能试验及人工短路试验,安全评价)专项服务公开招标(招标编号:CG0900022002369186),经评标委员会评审,现将中标候选人公示如下:1.评审情况1.1中标候选人基本情况及响应招标文件要求的资格能力条件序号标的标包中标候选人排序中标候选人名称投标报价质量工期/交货期资格能力条件1标的1:储能系统仿真测试、调试及搬迁配套服务储能系统仿真测试、调试及搬迁配套服务1南京南瑞继保工程技术有限公司481.6万元符合满足满足2标的3:安全评价安全评价1中国安全生产科学研究院30万元符合满足满足3标的 2:并网性能试 验及短路试验并网性能试验及短路试验投标家数不足,招标失败 1.2中标候选人按照招标文件要求承诺的项目负责人情况(如有)序号标的标包中标候选人排序中标候选人名称项目负责人姓名相关证书名称及编号1标的1:储能系统仿真测试、调试及搬迁配套服务储能系统仿真测试、调试及搬迁配套服务1南京南瑞继保工程技术有限公司//2标的3:安全评价安全评价1中国安全生产科学研究院// 2.其他公示内容无。3.监督投诉及异议投标人或其他利害关系人认为本次采购过程中存在违规行为的,或对资格预审文件(如有)、招标文件、评标结果存在异议的,有权通过招标代理机构向招标人提出。异议文件应当包括下列内容:提出异议人的名称、地址及有效联系方式;异议事项;有效线索和相关证明材料。提出异议人是法人的,异议文件必须由其法定代表人或者授权代表签字并盖章,同时还需提交授权委托书;其他组织或自然人提出异议的,异议文件必须由其主要负责人或提出异议人本人签字,并附有效身份证明复印件,由本人提交。异议人不得以异议为名排挤竞争对手,进行虚假、恶意异议,阻碍招标投标活动的正常进行。异议接收机构名称:南方电网供应链集团有限公司异议受理邮箱:zbybyk@csg.cn投标人或者其他利害关系人认为本次采购活动不符合法律、法规、规章规定的,可通过供应链统一服务平台(www.bidding.csg.cn),按以下步骤进入“三公”信箱提交投诉资料:供应链统一服务平台首页→“三公”信箱。投诉主体、时间、形式内容等不符合规定的,将不予受理:(1)投诉人应当是供应链业务活动当事人或其他利害关系人。(2)投诉应当在投诉人知道或者应当知道之日起10日内提出。(3)就资格预审文件、采购文件、开标及评审结果投诉的,应当先在规定时限内,通过公示公告注明的异议渠道向招标人提出异议。(4)投诉应当有明确的请求和必要的证明材料,包括投诉人和被投诉人名称、有效联系方式、投诉事项和相关请求、证明材料等。针对采购项目的投诉,应当附提出异议的证明文件;投诉人是单位的,应当提交单位负责人签字并加盖公章的书面投诉材料;投诉人是个人的,应当附有效身份证明复印件;投诉有关材料是外文的,应当附有中文译本,由翻译机构盖章或者翻译人员签名。(5)投诉人应对反映问题的真实性负责,不得捏造事实、伪造材料或以非法手段取得证明材料进行投诉,一经发现,将按照南方电网公司供应商管理相关制度进行处理。(6)投诉人应保持联系方式畅通,积极配合投诉核查,同一投诉问题请勿重复或多渠道提交。(7)投诉处理人员会严格遵守保密规定,不向无关人员透露知悉信息。4.联系方式招 标 人:深圳电网智慧能源技术有限公司联 系 人:任工电 话:4008100100-2 招标代理机构:南方电网供应链集团有限公司地 址:广州市天河区天河路178号联 系 人:罗工电 话:4008100100-2 招标人(或招标代理机构)主要负责人或授权的项目负责人(签名):马迪马迪招标人或其招标代理机构名称:南方电网供应链集团有限公司【盖章位置】2026年09月04日 上一篇:2026-2027年南方电网数字电网集团(贵州)有限公司-基础平台软件运维原厂标准服务直接采购公示 下一篇:深圳电网智慧能源技术有限公司2026年新型电力系统智能化升级改造项目、长富金茂大厦办公场所设计施工总承包框架采购公开招标中标公示

E1·China Southern Power Grid Supply Chain Platform·来源发布 2026/9/30

南方电网贵州电动汽车服务有限公司服务类2026年电动汽车构网保供装置小批量试制及现场应用验证技术服务直接采购项目直接采购公示

南方电网贵州电动汽车服务有限公司服务类2026年电动汽车构网保供装置小批量试制及现场应用验证技术服务直接采购项目直接采购公示(采购编号:CG3800062002421413) 1.采购条件本采购项目南方电网贵州电动汽车服务有限公司服务类2026年电动汽车构网保供装置小批量试制及现场应用验证技术服务直接采购项目,采购人为南方电网贵州电动汽车服务有限公司,项目资金已落实。该项目已具备采购条件,现对该项目进行直接采购。2.项目概况和采购范围2.1项目概述:本项目为南方电网贵州电动汽车服务有限公司服务类2026年电动汽车构网保供装置小批量试制及现场应用验证技术服务直接采购项目,共计1个标的,1个标包。2.2采购范围:南方电网贵州电动汽车服务有限公司服务类2026年电动汽车构网保供装置小批量试制及现场应用验证直接采购,采购内容为委托乙方提供电动汽车构网保供装置小批量试制及现场应用验证技术服务,技术服务成果包括5台20kW级电动汽车构网保供装置及标准附件,并包含安装调试、指定车辆适配、培训及挂网试运行技术支撑等配套技术服务。2.3项目所在地区:贵州省2.4采购分类:专项2.5项目类别:服务2.6标的清单: 序号标的名称标包名称预计采购金额(万元)最高限价(万元)服务期报价方式报价要求标包交付1【1】电动汽车构网保供装置小批量试制及现场应用验证技术服务【1-1】南方电网贵州电动汽车服务有限公司服务类2026年电动汽车构网保供装置小批量试制及现场应用验证技术服务直接采购155155自合同生效之日起14个月总价报价单价投标报价≤最高限价的为有效报价,当投标单价小于最高限价的85%时,须附成本分析报告,未附成本分析报告或未按评标委员会要求作澄清、说明的,作否决投标处理。详见技术规范书(三)其它关键要素:1、投标报价说明1)投标人全部以人民币为计价币种。2)所约定的所有工作内容和风险因数,各项费用和含税综合计算结果,即为完成约定工作内容的全部价格。投标人都应在报价中考虑。3)投标人只能按投标函格式和报价表格式(如有)进行报价,不得另外制作表格,否则,作否决投标处理。4)报价区间要求详见标的物清单。2、其他(预算/最高限价编制依据、承包方式、购买限制及投标要求、中标限制、投标报价编制原则、合同价格及结算方式、投标保证金等)1)承包方式:详见“需求一览表、结算基准价表及工程量清单”2)购买限制、投标要求、中标限制:详见“需求一览表、结算基准价表及工程量清单”3)投标报价编制原则:?投标人的报价应充分考虑项目至交付验收为止期间物价上涨、政策性调整等诸多因素以及由此引起的费用变动,并将其计入报价之内。?服务过程中,成交单位对外的交涉与纠纷,以及所造成的损失,除采购文件中有明确规定者外,均由成交单位自行解决。如确需采购人进行协调时,协调解决问题所发生的一切费用仍由成交单位承担。?所有价格为含增值税价格。4)合同价格及结算方式:详见“需求一览表、结算基准价表及工程量清单”5)投标保证金:本项目不收取保证金 3.采购方式原因说明及拟采购供应商信息3.1采用直接采购方式原因:序号内容11.本项目符合以下要求:本项目不属于国家法律法规及公司有关规定必须招标的范围。2.项目具体内容:前期科技项目已完成20kW级电动汽车构网保供装置样机研发和检测,检测覆盖保护、车型接入、能量平衡、构网控制、通信、构网性能、最大功率、效率、THD、高低温及IP防护等项目,结果均符合委托技术要求。为进一步验证装置在贵州电网典型应急保供场景下的长期运行适应性、现场可用性和批次一致性,拟委托原科技项目受托方提供5台同技术状态装置的小批量试制及现场应用验证技术服务。本次委托技术服务形成的5台20kW级电动汽车构网保供装置,核心技术状态须与公司前期科技项目已完成检测的样机完全一致。该装置为定制化研发产品,其构网控制算法、车辆直流接口、BMS通信协议、控制程序及关键参数配置均由原科技项目受托方自行设计,与市面其他品牌型号不兼容。更换技术服务方将导致技术接口不匹配、控制策略不一致,并需重新开展大量检测验证,严重影响挂网试运行的连续性和批次一致性,无法满足应急保供场景的功能配套要求。因此,需直接委托原科技项目受托方继续提供同技术状态装置的小批量试制及现场应用验证技术服务。3.符合非招标采购的具体规定要求:依据《中国南方电网有限责任公司非招标采购方式管理细则》(Q/CSG2293003-2025)附录C“四、直接采购(一)按照有关规定或者标准,有下列情形之一的货物、工程和服务,经批准可以采用直接采购方式:5. 需向原供应商采购,否则将影响施工或者功能配套要求。”本项目符合上述第5项情形,经批准可以采用直接采购方式。 3.2直接采购谈判对象信息:序号公司名称采购对象类似项目业绩或项目胜任力说明邀请标包联系人供应商联系方式1湖南大学采购对象湖南大学是教育部直属全国重点大学,国家“211工程”“985工程”和“双一流”建设高校,电气工程学科入选世界一流建设学科,拥有电能高效高质转化全国重点实验室、国家电能变换与控制工程技术研究中心等国家级科研平台,在电力电子变换、智能电网、新能源接入及车网互动领域具有长期技术积累。黄小庆团队长期开展电动汽车与电网互动、V2G/V2X及电力系统运行控制研究,已完成20 kW级电动汽车构网保供装置研发,掌握构网控制、双向功率变换、车辆BMS通信及保护控制等核心技术,前期装置已完成第三方检测和贵州现场验证。本次采购5台装置与前期研发样机保持同一技术路线和技术状态,具备小批量工程化试制和挂网应用基础。【1】电动汽车构网保供装置小批量试制及现场应用验证技术服务[【1-1】南方电网贵州电动汽车服务有限公司服务类2026年电动汽车构网保供装置小批量试制及现场应用验证技术服务直接采购]黄小庆13975867006 4.公示期限及发布媒介公示期:2026年09月30日 至2026年10月08日本公示在南方电网公司供应链统一服务平台(www.bidding.csg.cn)进行发布。5.异议及投诉5.1供应商或者其他利害关系人对本项目采用直接采购方式有异议的,应当以书面形式在公示期间内提出,异议文件应当包括下列内容:(1)异议提出人的名称、地址及有效联系方式;(2)异议事项;(3)有效线索和相关证明材料。异议提出人是法人的,异议文件必须由其法定代表人或者授权代表签字并盖章(授权代表同时还需提交授权委托书);其他组织或自然人提出异议的,异议文件必须由其主要负责人或提出异议人本人签字,并附有效身份证明复印件,由本人提交。异议递交地点:南方电网贵州电动汽车服务有限公司综合部异议递交地点:贵州省贵阳市粑粑街7号异议递交邮箱:nwgzdd@126.com异议递交电话:0851-852807085注:投标人对开标有异议的,在开标结果确认期间内通过南方电网公司供应链统一服务平台(www.bidding.csg.cn)按要求提交。5.2投标人(供应商)或者其他利害关系人认为本次招标活动不符合法律、法规、规章规定的,可通过供应链统一服务平台(www.bidding.csg.cn),按以下步骤进入“三公”信箱提交投诉资料:供应链统一服务平台首页→“三公”信箱。投诉主体、时间、形式内容等不符合规定的,将不予受理:(1)投诉人应当是供应链业务活动当事人或其他利害关系人。(2)投诉应当在投诉人知道或者应当知道之日起10日内提出。(3)就本项目采购方式投诉的,应当先在规定时限内,通过公示公告注明的异议渠道向招标人(采购人)提出异议。(4)投诉应当有明确的请求和必要的证明材料,包括投诉人和被投诉人名称、有效联系方式、投诉事项和相关请求、证明材料等。针对采购项目的投诉,应当附提出异议的证明文件;投诉人是单位的,应当提交单位负责人签字并加盖公章的书面投诉材料;投诉人是个人的,应当附有效身份证明复印件;投诉有关材料是外文的,应当附有中文译本,由翻译机构盖章或者翻译人员签名。(5)投诉人应对反映问题的真实性负责,不得捏造事实、伪造材料或以非法手段取得证明材料进行投诉,一经发现,将按照南方电网公司供应商管理相关制度进行处理。(6)投诉人应保持联系方式畅通,积极配合投诉核查,同一投诉问题请勿重复或多渠道提交。(7)投诉处理人员会严格遵守保密规定,不向无关人员透露知悉信息。5.3异议提出人或投诉人不得以异议投诉为名排挤竞争对手,不得进行虚假、恶意投诉,阻碍招标投标活动的正常进行。经核查发现所提出的异议或投诉存在诬告、故意扰乱招投标秩序等恶意行为,将按照《中国南方电网有限责任公司供应商不良行为处理管理细则》等制度进行处理。6.联系方式招 标 人:南方电网贵州电动汽车服务有限公司招标代理机构:南方电网供应链(贵州)有限公司地 址:贵州省贵阳市粑粑街7号联 系 人:曾工电 话:4008100100转2转4 招标人(或招标代理机构)主要负责人或授权的项目负责人(签名):曾宗耀 招标人或其招标代理机构名称(盖章):南方电网供应链(贵州)有限公司【盖章位置】 2026年9月30日) 上一篇:南网储能云南丽江华坪产业园区电池储能项目5MW/20MWh全钒液流储能系统直流侧设备集成及20MWh电解液经营性租赁货物类公开招标项目中标公示 下一篇:广西电网公司2026年第二批行政办公专业食材采购配送服务等11个公开招标采购项目中标公示

不兼容原始依据
E2·OpenAlex·来源发布 2026/1/1

LCL Resonance Analysis and Damping in Single-Loop Grid-Forming Wind Turbines

LCL Resonance Analysis and Damping in Single-Loop Grid-Forming Wind Turbines doi: https://doi.org/10.1109/tie.2026.3692859 type: article authorships: [{"author_position":"first","author":{"id":"https://openalex.org/A5100357858","display_name":"Meng Chen","orcid":"https://orcid.org/0000-0002-4331-2907","observed_orcids":["https://orcid.org/0000-0002-4331-2907"]},"institutions":[{"id":"https://openalex.org/I241749","display_name":"University of Cambridge","ror":"https://ror.org/013meh722","country_code":"GB","type":"education","lineage":["https://openalex.org/I241749"]}],"countries":["GB"],"is_corresponding":false,"raw_author_name":"Meng Chen","raw_affiliation_strings":["Department of Engineering, University of Cambridge, Cambridge, U.K"],"raw_orcid":"https://orcid.org/0000-0002-4331-2907","affiliations":[{"raw_affiliation_string":"Department of Engineering, University of Cambridge, Cambridge, U.K","institution_ids":["https://openalex.org/I241749"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5080233785","display_name":"Yufei Xi","orcid":"https://orcid.org/0000-0002-7473-2939","observed_orcids":["https://orcid.org/0000-0002-7473-2939"]},"institutions":[{"id":"https://openalex.org/I4405272849","display_name":"State Key Laboratory of Power System Operation and Control","ror":"https://ror.org/04tfk4w22","country_code":"CN","type":"facility","lineage":["https://openalex.org/I4405272849"]},{"id":"https://openalex.org/I99065089","display_name":"Tsinghua University","ror":"https://ror.org/03cve4549","country_code":"CN","type":"education","lineage":["https://openalex.org/I99065089"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Yufei Xi","raw_affiliation_strings":["State Key Laboratory of Power System Operation and Control (Department of Electrical Engineering), Tsinghua University, Beijing, China"],"raw_orcid":"https://orcid.org/0000-0002-7473-2939","affiliations":[{"raw_affiliation_string":"State Key Laboratory of Power System Operation and Control (Department of Electrical Engineering), Tsinghua University, Beijing, China","institution_ids":["https://openalex.org/I4405272849","https://openalex.org/I99065089"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5039395705","display_name":"Frede Blaabjerg","orcid":"https://orcid.org/0000-0001-8311-7412","observed_orcids":["https://orcid.org/0000-0001-8311-7412"]},"institutions":[{"id":"https://openalex.org/I891191580","display_name":"Aalborg University","ror":"https://ror.org/04m5j1k67","country_code":"DK","type":"education","lineage":["https://openalex.org/I891191580"]}],"countries":["DK"],"is_corresponding":false,"raw_author_name":"Frede Blaabjerg","raw_affiliation_strings":["AAU Energy, Aalborg University, Aalborg, Denmark"],"raw_orcid":"https://orcid.org/0000-0001-8311-7412","affiliations":[{"raw_affiliation_string":"AAU Energy, Aalborg University, Aalborg, Denmark","institution_ids":["https://openalex.org/I891191580"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5074583271","display_name":"Lin Cheng","orcid":"https://orcid.org/0000-0002-6868-1493","observed_orcids":["https://orcid.org/0000-0002-6868-1493"]},"institutions":[{"id":"https://openalex.org/I4405272849","display_name":"State Key Laboratory of Power System Operation and Control","ror":"https://ror.org/04tfk4w22","country_code":"CN","type":"facility","lineage":["https://openalex.org/I4405272849"]},{"id":"https://openalex.org/I99065089","display_name":"Tsinghua University","ror":"https://ror.org/03cve4549","country_code":"CN","type":"education","lineage":["https://openalex.org/I99065089"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Lin Cheng","raw_affiliation_strings":["State Key Laboratory of Power System Operation and Control (Department of Electrical Engineering), Tsinghua University, Beijing, China"],"raw_orcid":"https://orcid.org/0000-0002-6868-1493","affiliations":[{"raw_affiliation_string":"State Key Laboratory of Power System Operation and Control (Department of Electrical Engineering), Tsinghua University, Beijing, China","institution_ids":["https://openalex.org/I4405272849","https://openalex.org/I99065089"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5082551328","display_name":"Ioannis Lestas","orcid":"https://orcid.org/0000-0002-7739-949X","observed_orcids":["https://orcid.org/0000-0002-7739-949X"]},"institutions":[{"id":"https://openalex.org/I241749","display_name":"University of Cambridge","ror":"https://ror.org/013meh722","country_code":"GB","type":"education","lineage":["https://openalex.org/I241749"]}],"countries":["GB"],"is_corresponding":false,"raw_author_name":"Ioannis Lestas","raw_affiliation_strings":["Department of Engineering, University of Cambridge, Cambridge, U.K"],"raw_orcid":"https://orcid.org/0000-0002-7739-949X","affiliations":[{"raw_affiliation_string":"Department of Engineering, University of Cambridge, Cambridge, U.K","institution_ids":["https://openalex.org/I241749"]}]}] primary_topic: {"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.8695999979972839,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}} primary_location: {"id":"doi:10.1109/tie.2026.3692859","doi":"https://doi.org/10.1109/tie.2026.3692859","is_oa":false,"landing_page_url":"https://doi.org/10.1109/tie.2026.3692859","pdf_url":null,"source":{"id":"https://openalex.org/S58031724","display_name":"IEEE Transactions on Industrial Electronics","issn_l":"0278-0046","issn":["0278-0046","1557-9948"],"is_oa":false,"is_in_doaj":false,"is_core":true,"listed_in":["cwts-core","dongbi-a","jufo-3","ki-jl-1","norway-2","poland-200","russia-white-list-1","vabb-shw"],"host_organization":"https://openalex.org/P4310319808","host_organization_name":"Institute of Electrical and Electronics Engineers","host_organization_lineage":["https://openalex.org/P4310319808"],"host_organization_lineage_names":["Institute of Electrical and Electronics Engineers"],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"IEEE Transactions on Industrial Electronics","raw_type":"journal-article"} open_access: {"is_oa":true,"oa_status":"green","oa_url":"https://arxiv.org/pdf/2504.06981","any_repository_has_fulltext":true} abstract_inverted_index: {"A":[0],"common":[1],"assumption":[2],"in":[3,19,80,103],"both":[4,96],"grid-following":[5],"(GFL)":[6],"and":[7,36,85,98,127],"grid-forming":[8],"(GFM)":[9],"control":[10,49,130],"systems":[11],"is":[12,101,117,140],"that":[13,45,108],"they":[14],"are":[15,29],"open-loop":[16],"(OL)":[17],"stable":[18],"the":[20,112],"vicinity":[21],"of":[22,56,92],"high-frequency":[23],"resonances.":[24],"Hence,":[25],"classical":[26],"loop-shaping":[27],"approaches":[28],"often":[30],"used":[31,54],"for":[32,111],"establishing":[33],"stability":[34,83],"margins":[35],"designing":[37],"active":[38],"damping":[39],"(AD)":[40],"strategies.":[41],"This":[42,72],"article":[43],"shows":[44],"single-loop":[46],"GFM":[47],"(SL-GFM)":[48],"schemes":[50],"incorporating":[51],"a":[52,75,81,122],"widely":[53],"class":[55],"reactive":[57],"power":[58],"(RAP)":[59],"control,":[60,65],"referred":[61],"to":[62,68,95],"as":[63],"droop-I":[64],"can":[66],"lead":[67],"OL":[69],"unstable":[70],"poles.":[71],"finding":[73],"reveals":[74],"novel":[76],"instability":[77,115],"mechanism":[78,116],"resulting":[79],"reduced":[82],"margin":[84],"robustness":[86],"at":[87],"high":[88],"frequencies.":[89],"The":[90],"sensitivity":[91],"this":[93],"phenomenon":[94],"RAP":[97],"electrical":[99],"parameters":[100],"analyzed":[102],"detail.":[104],"An":[105],"AD":[106],"design":[107],"explicitly":[109],"accounts":[110],"newly":[113],"identified":[114],"proposed.":[118],"We":[119],"also":[120],"provide":[121],"comparison":[123],"between":[124,137],"such":[125],"SL-GFM":[126],"well-studied":[128],"GFL":[129],"schemes,":[131],"highlighting":[132],"quite":[133],"different":[134],"resonance":[135],"features":[136],"them.":[138],"Validation":[139],"performed":[141],"through":[142],"experiments.":[143]} referenced_works: [] cited_by_count: 0

instability原始依据

进展或反证 · 1

E2·OpenAlex·来源发布 2026/5/28

Resilient SDN-Based Communication Architecture for Adaptive Control in Green Hydrogen Hybrid Microgrids

Resilient SDN-Based Communication Architecture for Adaptive Control in Green Hydrogen Hybrid Microgrids doi: https://doi.org/10.3390/electronics15112335 type: article authorships: [{"author_position":"first","author":{"id":"https://openalex.org/A5137240043","display_name":"Joaquín Ascencio Villagra","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I134695357","display_name":"Universidad de Talca","ror":"https://ror.org/01s4gpq44","country_code":"CL","type":"education","lineage":["https://openalex.org/I134695357"]}],"countries":["CL"],"is_corresponding":false,"raw_author_name":"Joaquín Ascencio Villagra","raw_affiliation_strings":["Department of Computer Science, Universidad de Talca, Curico 3340000, Chile"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Department of Computer Science, Universidad de Talca, Curico 3340000, Chile","institution_ids":["https://openalex.org/I134695357"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5005920260","display_name":"Ricardo Pérez Guzmán","orcid":null,"observed_orcids":[]},"institutions":[{"id":"https://openalex.org/I134695357","display_name":"Universidad de Talca","ror":"https://ror.org/01s4gpq44","country_code":"CL","type":"education","lineage":["https://openalex.org/I134695357"]}],"countries":["CL"],"is_corresponding":false,"raw_author_name":"Ricardo Pérez Guzmán","raw_affiliation_strings":["Department of Computer Science, Universidad de Talca, Curico 3340000, Chile"],"raw_orcid":"https://orcid.org/0000-0002-9149-5074","affiliations":[{"raw_affiliation_string":"Department of Computer Science, Universidad de Talca, Curico 3340000, Chile","institution_ids":["https://openalex.org/I134695357"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5086030146","display_name":"Marco E. Rivera","orcid":"https://orcid.org/0000-0002-4353-2088","observed_orcids":["https://orcid.org/0000-0002-4353-2088"]},"institutions":[{"id":"https://openalex.org/I142263535","display_name":"University of Nottingham","ror":"https://ror.org/01ee9ar58","country_code":"GB","type":"education","lineage":["https://openalex.org/I142263535"]}],"countries":["GB"],"is_corresponding":false,"raw_author_name":"Marco Rivera","raw_affiliation_strings":["Power Electronics, Machines and Control (PEMC) Research Institute, University of Nottingham, Nottingham NG7 2RD, UK"],"raw_orcid":"https://orcid.org/0000-0002-4353-2088","affiliations":[{"raw_affiliation_string":"Power Electronics, Machines and Control (PEMC) Research Institute, University of Nottingham, Nottingham NG7 2RD, UK","institution_ids":["https://openalex.org/I142263535"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5008269852","display_name":"Patrick William Wheeler","orcid":"https://orcid.org/0000-0003-0307-581X","observed_orcids":["https://orcid.org/0000-0003-0307-581X"]},"institutions":[{"id":"https://openalex.org/I142263535","display_name":"University of Nottingham","ror":"https://ror.org/01ee9ar58","country_code":"GB","type":"education","lineage":["https://openalex.org/I142263535"]}],"countries":["GB"],"is_corresponding":false,"raw_author_name":"Patrick Wheeler","raw_affiliation_strings":["Power Electronics, Machines and Control (PEMC) Research Institute, University of Nottingham, Nottingham NG7 2RD, UK"],"raw_orcid":"https://orcid.org/0000-0003-0307-581X","affiliations":[{"raw_affiliation_string":"Power Electronics, Machines and Control (PEMC) Research Institute, University of Nottingham, Nottingham NG7 2RD, UK","institution_ids":["https://openalex.org/I142263535"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5039395705","display_name":"Frede Blaabjerg","orcid":"https://orcid.org/0000-0001-8311-7412","observed_orcids":["https://orcid.org/0000-0001-8311-7412"]},"institutions":[{"id":"https://openalex.org/I891191580","display_name":"Aalborg University","ror":"https://ror.org/04m5j1k67","country_code":"DK","type":"education","lineage":["https://openalex.org/I891191580"]}],"countries":["DK"],"is_corresponding":false,"raw_author_name":"Frede Blaabjerg","raw_affiliation_strings":["Department of Energy Technology, Aalborg University, 9220 Aalborg, Denmark"],"raw_orcid":"https://orcid.org/0000-0001-8311-7412","affiliations":[{"raw_affiliation_string":"Department of Energy Technology, Aalborg University, 9220 Aalborg, Denmark","institution_ids":["https://openalex.org/I891191580"]}]}] primary_topic: {"id":"https://openalex.org/T10714","display_name":"Software-Defined Networks and 5G","score":0.6942999958992004,"subfield":{"id":"https://openalex.org/subfields/1705","display_name":"Computer Networks and Communications"},"field":{"id":"https://openalex.org/fields/17","display_name":"Computer Science"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}} primary_location: {"id":"doi:10.3390/electronics15112335","doi":"https://doi.org/10.3390/electronics15112335","is_oa":true,"landing_page_url":"https://doi.org/10.3390/electronics15112335","pdf_url":null,"source":{"id":"https://openalex.org/S4210202905","display_name":"Electronics","issn_l":"2079-9292","issn":["2079-9292"],"is_oa":true,"is_in_doaj":false,"is_core":true,"listed_in":["anvur-scientific","cwts-core","norway-1","poland-100","russia-white-list-2","vabb-shw"],"host_organization":"https://openalex.org/P4310310987","host_organization_name":"Multidisciplinary Digital Publishing Institute","host_organization_lineage":["https://openalex.org/P4310310987"],"host_organization_lineage_names":["Multidisciplinary Digital Publishing Institute"],"type":"journal"},"license":"cc-by","license_id":"https://openalex.org/licenses/cc-by","version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Electronics","raw_type":"journal-article"} open_access: {"is_oa":true,"oa_status":"gold","oa_url":"https://doi.org/10.3390/electronics15112335","any_repository_has_fulltext":true} abstract_inverted_index: {"20":[154],"61850":[86],"Integrating":[0],"green":[1,62],"hydrogen":[2,63,234],"systems":[3],"into":[4],"hybrid":[5,59],"microgrids":[6,235],"introduces":[7],"nonlinear":[8],"dynamics":[9],"that":[10,112],"compromise":[11],"control":[12,22,91,227],"stability":[13],"during":[14,196,236],"operational":[15],"transitions.":[16],"The":[17,137,239],"performance":[18],"of":[19,48,144,149,163,204,243,250],"the":[20,26,32,74,81,113,150,153,170,190,201,213,219],"advanced":[21],"loops":[23],"depends":[24],"on":[25],"latency":[27,117,143],"and":[28,77,93,106,126,179,193,228],"reliability":[29,164],"provided":[30],"by":[31,119],"communication":[33,221,245],"infrastructure.":[34],"This":[35,161],"paper":[36],"proposes":[37],"a":[38,58,141,166,248],"Software-Defined":[39],"Networking":[40],"(SDN)":[41],"architecture":[42],"integrated":[43],"with":[44,61,71],"an":[45],"adaptive":[46],"Quality":[47],"Service":[49],"(AQoS)":[50],"framework":[51,115,217],"to":[52,122,224],"support":[53],"time-critical":[54],"data":[55],"flows":[56],"in":[57,69,232],"microgrid":[60,100],"integration.":[64],"An":[65],"emulated":[66],"network":[67,237],"topology":[68],"GNS3,":[70],"OpenDaylight":[72],"as":[73,80],"SDN":[75,124,176],"controller":[76],"Open":[78],"vSwitch":[79],"forwarding":[82],"plane,":[83],"reproduces":[84],"IEC":[85],"traffic":[87,96],"patterns,":[88],"including":[89,102],"GOOSE,":[90],"set-points":[92],"MMS.":[94],"These":[95],"classes":[97],"coordinate":[98],"key":[99],"components,":[101],"electrolysers,":[103],"fuel":[104],"cells":[105],"battery":[107],"storage.":[108],"Experimental":[109],"results":[110],"show":[111],"SDN-AQoS":[114,138],"reduces":[116],"variance":[118],"60%":[120],"compared":[121],"unmanaged":[123,175],"configurations":[125],"delivers":[127],"49.4%":[128],"higher":[129],"throughput":[130],"than":[131],"traditional":[132],"TCP/IP":[133,172],"networks":[134],"under":[135],"congestion.":[136,238],"configuration":[139],"achieves":[140],"median":[142],"9.68":[145],"ms,":[146],"keeping":[147],"97.5%":[148],"measurements":[151],"below":[152],"ms":[155],"safety":[156,230],"threshold":[157],"for":[158,208],"electrolyser":[159,229],"control.":[160],"level":[162],"represents":[165],"substantial":[167],"improvement":[168],"over":[169],"plain":[171],"at":[173,177,183],"90%,":[174],"66.7%":[178],"static":[180],"QoS":[181,185,210],"policing":[182],"60%.":[184],"rules":[186],"are":[187],"configured":[188],"through":[189],"RESTCONF":[191],"interface":[192],"remain":[194],"fixed":[195],"each":[197],"experiment":[198],"while":[199],"enabling":[200],"future":[202,251],"integration":[203],"reinforcement":[205],"learning":[206],"agents":[207],"autonomous":[209],"adaptation.":[211],"At":[212],"same":[214],"time,":[215],"this":[216],"supports":[218],"bounded":[220],"delay":[222],"required":[223],"sustain":[225],"frequency":[226],"coordination":[231],"low-inertia":[233],"physical":[240],"layer":[241],"impact":[242],"these":[244],"improvements":[246],"remains":[247],"subject":[249],"hardware-in-the-loop":[252],"validation.":[253]} referenced_works: ["https://openalex.org/W1973308398","https://openalex.org/W2489492730","https://openalex.org/W2492011434","https://openalex.org/W2791197249","https://openalex.org/W2885063961","https://openalex.org/W2909408609","https://openalex.org/W4292202268","https://openalex.org/W4309079489","https://openalex.org/W4321377259","https://openalex.org/W4379116895","https://openalex.org/W4390738896","https://openalex.org/W4391150576","https://openalex.org/W4391345588","https://openalex.org/W4391649808","https://openalex.org/W4401425636","https://openalex.org/W4405221853","https://openalex.org/W4406123686","https://openalex.org/W4408423329","https://openalex.org/W4409607329","https://openalex.org/W4410209814","https://openalex.org/W4410491953","https://openalex.org/W4414492073","https://openalex.org/W4414873985","https://openalex.org/W4415672336","https://openalex.org/W4416137256","https://openalex.org/W7126046285","https://openalex.org/W7151920923"] cited_by_count: 0

validatedvalidation原始依据